Most raw materials shortages occurring in January stem from a decision made in October — to wait.
A buyer reviews inventory in the fall, sees fully-stocked shelves, and moves on to more pressing matters. Then the holidays intervene. Jobs that would have shipped within two days now require a week. A key additive goes on allocation. The first major production run of the new year sits, idle, waiting on a truck stopped by an ice storm on I-80.
This happens to good companies every year — and most of it can be avoided. The cure lies in a planning discussion with your distribution partner, conducted early enough to make a difference.
Why the fourth quarter is different
Q4 offers the most supply chain risk for every working day of the year.
The calendar is the first culprit. Thanksgiving, Christmas and New Year’s leave fewer working days in November and December than in any other month. Your suppliers, your distributor, the carriers, and your own receiving dock each shut down on different days. A viable plan cannot be built around a non-existent calendar.
Weather is the second. Many water-based raw materials, including latex emulsions and a range of additives, should never be allowed to freeze. From late fall through winter, these materials require heated trucks for transportation. Heated capacity is limited, and all shippers of water-based products want it during the same cold weeks.
Finally, there is the year-end inventory squeeze. It is common for companies to reduce their material levels before December 31, and for suppliers to do the same. When everyone carries less inventory, there is less cushion to absorb a delay.
Then, of course, is January, with its frequently changing prices. Companies in the paint and coatings industries begin building inventory for the spring selling season just as the supply chain emerges from the holidays, and demand begins to rise.
What goes wrong when planning begins late
Late planning rarely creates a single catastrophic shortfall. More commonly, it produces a chain of small disruptions.
A forecast arrives at the distributor’s office in mid-December. The supplier has closed its order book for the year, and the shipment arrives in January. The production run begins — and so does the customer delivery.
An order comes on time, but no one confirms the shipping method. A tote of emulsion travels on an unheated trailer and arrives frozen. The material might be unusable, and the replacement, if available at all, has a several-week lead time.
A specialty grade, normally shipped from stock, is in short supply. Other customers ordered ahead, and those who anticipated the shortage get the material. Everyone else waits until the next production run.
In every case, the buyer knows what the plant needs. The distributor simply knows it is too late to act.
What good Q4 planning looks like
A good Q4 plan fits on a single page. Share it with your distributor by early November, then update it as conditions change.
- Forecast through the end of Q1. A range is acceptable. Your distributor will use it to order replenishment materials before year-end cutoffs occur.
- Identify critical materials. Call out any item capable of shutting down a line, including single-source grades, imported products and long-lead-time items.
- Cross-reference holiday calendars. For your plant, your receiving dock and your distributor, note days when staff will be unavailable. Then assign a final order date to each material.
- Prepare for the cold. Identify every material requiring temperature control, then reserve heated shipment space early in the year.
- Inquire about January 1 price changes. Consider buying ahead, if appropriate.
- Designate contacts. Holiday staff changes mean everyone needs a backup.
You do not need to be completely accurate in creating this plan. An approximate forecast made in October has far more value than one made in December.
Why does your distributor belong in the planning
A distributor sees the big picture in ways that individual buyers cannot. We understand purchasing patterns among multiple customers, and can advise on alternate grades before a product shortage occurs. We have early knowledge of supplier lead times and allocation freezes, and know which carriers still have heated capacity available.
By sharing your plan with us, you allow us to align it with this larger perspective. We can notify you when a supplier begins to tighten, or recommend an approved substitute grade. We can also stage material near your plant, so that a winter shipping delay only creates a short interruption in your production schedule.
All of this takes time to arrange. The more advance notice we have, the more flexibility we can build into your supply chain.
Plan Q4 with Trans Western Chemicals
At Trans Western Chemicals, Q4 planning is part of our commitment to our customers. We have six warehouses in La Mirada, Portland, Salt Lake City, Dallas, Houston, and Joliet, positioned to support manufacturing plants in the West, Southwest, and Midwest. Next-day delivery is available from every location.
We are a family-owned distributor, and the people who help you plan in October are the same people who answer your call in December.
If you have not yet shared your Q4 and early Q1 requirements with us, now is a good time to do so. Talk with your TWC sales representative or use our contact form to arrange a meeting.